New Loadshedding Schedule (Irrelevant Today)

This is the new loadshedding schedule from 2070/9/21:
Gregorian Date: 5th January, 2014

















This notice of loadshedding is irrelevant today as there is no loadshedding or scheduled power cuts in Nepal for common households. However loadshedding exists for industrial usages as the industrial demand for electricty still are not fulfilled and industries run on lesser than their installed capacities due to power shortages and have diesel generators with them for backups on power cuts due to situations not under control or as per schedule.

0 Comments:

Post a Comment